Type: Residential Project: Single-Family Residences Scope: Structural Repairs Location: Littleton, CO Value: $1.5MM Duration: Five Months
Description: The subdivision had inconsistent fill, causing hillside creep and several homes to experience differential movement. The original foundation systems did not adequately support the structures.
Project Scope: • Four 4,000 square foot homes • Partial removal of basements; protection of remaining basement finishes • Install 70+ hydraulically driven steel piers • Install 10+ helical piers • Install 20 micropiles • Deep compaction grouting • Install new interior drains and vapor barriers • Repair structural floors and decks • Repair stucco and building envelope • Replace basement finishes
Challenges: • Homes occupied throughout construction • Deep piers (40 to 60 feet) • Deep micropiles (80 to 100 feet) • Steep slope limited access to back of homes
|
|
|
|