Medical Campus Repairs

Repair and restoration of a 2-level visitor’s parking structure on a major hospital medical campus.

PROJECT INFORMATION

Duration:

4 Months

Value:

$500K

Services Performed:

Concrete Restoration and Waterproofing

Type:

Commercial

scope:

  • Preconstruction/construction management
  • Coordination of construction activities with tenant and property management team
  • Install and maintain shoring
  • Partial depth repair of concrete decks; route and seal cracks
  • Repair deck connections between double tees
  • Repair double tee stem supports
  • Repair double tee supports
  • Repair corbels
  • Shot blast and surface preparation of concrete substrate; application of BASF traffic membrane system
  • Remove and replace joint and cove sealants
  • Power wash deck and complete pavement markings

project outcomes:

  • Maintained the health and safety of tenants and general public throughout the active job site
  • Repaired phasing critical to allow continuous site access and parking structure operation
  • Installed temporary enclosures and heat to perform work during winter conditions